The cablecranes has been used for the construction of the Baixo Sabor dam. The consortium Bento Pedroso Contrucoes e Lena Engenharia identified the Agudio cablecranes as the most reliable equipment to execute the 100.000 cycles required to pour the 800.000 m3 of concrete required for the construction of the dam.
Company: Bento Pedroso Contrucoes e Lena Engenharia - Location: Torre de Moncorvo - Country: Portugal - Year: 2010 - Type of ropeway: Cablecrane
Capacity ton | 2x28 | |
Span in m | 610 | |
Translation speed in m/s | 8 | |
Hoisting speed in m/s | 2,5 | |
Vertical hook rise in m | 140 |