Design and supply of hook carriages and slack carriers for the two oscillating cablecranes used for the construction of the Hoover dam by-pass bridge.
The cablecranes has been used to move equipment and concrete within the site and to position prebuild sections of the bridge.
Company: F&M Mafco Inc. - Location: Colorado river - Country: USA - Year: 2007 - Type of ropeway: Cablecrane
![]() | Capacity ton | 2x45 |
![]() | Span in m | 760 |
![]() | Translation speed in m/s | 1 |
![]() | Hoisting speed in m/s | 0,5 |
![]() | Vertical hook rise in m | 200 |