Design and supply of hook carriages and slack carriers for the two oscillating cablecranes used for the construction of the Hoover dam by-pass bridge.
The cablecranes has been used to move equipment and concrete within the site and to position prebuild sections of the bridge.
Company: F&M Mafco Inc. - Location: Colorado river - Country: USA - Year: 2007 - Type of ropeway: Cablecrane
Capacity ton | 2x45 | |
Span in m | 760 | |
Translation speed in m/s | 1 | |
Hoisting speed in m/s | 0,5 | |
Vertical hook rise in m | 200 |