Major overhauling of the existing ropeway in operation in Campulung cement plant to bring the material downhill from the quarry to the cement plant on a straight way. The intervention included the full replacement of the electromechanical system (to be installed in the existing, unmodified, stations) and the full automation and synchronization of the ropeway.
Company: Holcim - Location: Boteni - Country: Romania - Year: 2013 - Type of ropeway: Material ropeway
Length in m | 650 | |
Height difference | 80 | |
Capacity ton/h | 120 | |
Speed in m/s | 2,5 | |
Number of buckets | 31 |