Boteni, Romania

Material ropeway - Boteni, Romania

Major overhauling of the existing ropeway in operation in Campulung cement plant to bring the material downhill from the quarry to the cement plant on a straight way. The intervention included the full replacement of the electromechanical system (to be installed in the existing, unmodified, stations) and the full automation and synchronization of the ropeway.

Company: Holcim - Location: Boteni - Country: Romania - Year: 2013 - Type of ropeway: Material ropeway

Length in m650
Height difference80
Capacity ton/h120
Speed in m/s2,5
Number of buckets31

Leitner S.p.A.

Via Tommaso Agudio, 8 – 10040
Leini (Torino) - Italy
Phone: +39.011.0721200 – Fax: +39.011.9981356
Email: info@agudio.com