Revamping of the two existing lines connecting the Alpetto quarry with the cement plant in Merone, main intervention has been: general overhauling with capacity increase, replacement of winch and electrical system, replacement of buckets, installation of new tire beams to better control the acceleration and deceleration of buckets into the stations, enlargement of loading station with installation of a new rotating feeder.
Company: Holcim - Location: Merone - Country:Italy - Year: 1980 - 2006 - Type of ropeway: Material ropeway
Length in m | 5915 | |
Height difference in m | 70 | |
Capacity ton/h | 425 | |
Speed in m/s | 3,2 | |
Number of buckets | 185 |