Engineering and construction of a material ropeway for limestone transportation from Itaretama quarry to the cement plant with a capacity of 600 ton/h. The ropeway is 13.7 km long and it is composed by three sections with one loading station, one offloading station and two intermediate stations.
Company: Votorantim - Location: Rio Branco do Sul - Country: Brazil - Year: 1978 - Type of ropeway: Material ropeway
![]() | Length in m | 13700 |
![]() | Height difference | 400 |
![]() | Capacity ton/h | 600 |
![]() | Speed in m/s | 5 |
![]() | Number of buckets | 475 |